DummyPPC

1 Response | Created by smais |

Take the test

  1. 1

    Labour efficiency factor is applied after capacity requirement of equipment is calculated.

  2. 2

    Increase in inventory carrying cost increases EOQ.

  3. 3

    The LOB technique is most appropriate for assembly operations involving number of distinct components.

  4. 4

    ______ are grouped so that their total time is preferably equal to or little lesser than the time available each work station.

  5. 5

    If efficiency is more, the manufacturing time required for completion of job would be generally :-

  6. 6

    The earliest start time of an activity equals to earliest event time of :-

  7. 7

    To minimize total throughout time we are required to minimize :-

  8. 8

    As the quantity increases, the procurement cost :-

  9. 9

    Job production requires ______ capital investment.

  10. 10

    The assignment method is also called as :-

  11. 11

    Production Planning and Control makes the supervisor ineffective.

  12. 12

    Lead time is ______ for different items.

  13. 13

    Development of additional vendors/suppliers depends upon :-

  14. 14

    If number of work stations is 8 and work content of all stations is 32 , the cycle time would be ______.

  15. 15

    Random fluctuation is addition of cyclical fluctuation and seasonal fluctuation.

  16. 16

    Work sampling is ______

  17. 17

    The assembly work content [ Wi ] of the i'th station having n work stations is given by :-

  18. 18

    A company where different personnel give conflicting delivery promises need to improve its scheduling and processing function.

  19. 19

    A type items are always vital under VED analysis.

  20. 20

    As the quantity increases, the procurement cost :-

  21. 21

    In ABC analysis, the classification is based on :-

  22. 22

    Fluctuation due to changes in season are called cyclical fluctuation.