Volume 2

6 Responses | Created by Naka2209 |
  1. 1

    When an I023 management notice indicates suitable interchangeable or substitute itmes are available for issue, with whom must Demand Processing personnel verify approval?

  2. 2

    Issues from a supply point are considered

  3. 3

    What do personnel in a supply point use to process issues when they are operating without a terminal function?

  4. 4

    The computer transaction automatically created to record the withdrawal of a mobility readiness spare package asset to satisfy a mission capability requirement is called

  5. 5

    What activity code identifies an issue request as core automated maintenance system document?

  6. 6

    What Standard Base Supply System output notifies the core automated maintenance systemof changes in due-out status?

  7. 7

    How are cannibalizations processed for a mission capability termination?

  8. 8

    Which system provides visibility of mission capability and awaiting parts transactions by accepting transactions from depots and bases worldwide, maintains master records and reports for all levels...

  9. 9

    To preform the due-in from maintenance reconciliation, what listing is used?

  10. 10

    What due-in from maintenance detail records can be updated by the transaction identification code "DFM" input?

  11. 11

    When monitoring awaiting parts end items, personnel at bases submit requests for repair parts on a fill or backorder basis using the urgency justification code

  12. 12

    Failure to process transaction identication code "TRN" data in a correct and timely manner results in reduced base stock levels and incomplete reports from which buy, repair, and distribution...

  13. 13

    What product would you see to verify transaction identification code "TRN" processing is completed?

  14. 14

    The net repair cycle days for a transaction identication code "TRN" input must be manually computed

  15. 15

    To manage the flow of repair cycle assets properly, the preferred location for the processing of due-in from maintenance turn-ins is

  16. 16

    The small groups of selected "XD" items that are canididates for two-level repair are known as

  17. 17

    What listing will stock control personnel use to monitor property awaiting disposition instructions from the item manager?

  18. 18

    An XF3 item cannot be considered for condemnation unless it cannot be repaired or the cost to repair exceeeds what percentage of the replacement cost?

  19. 19

    What supply condition code and code is used to process a Product Quality/Materiel Deficiency Report turn-in?

  20. 20

    What input is used to load the warehouse location Product Quality Materiel Deficiency Report control number on the due-in from maintenance detail record?

Rating

0 votes
Take this first to vote!

Add to Favorites

© 2012 Miva AK, Inc.